29 Mar 2019
JEC has secured a contract from the Airport Authority Hong Kong for the advance works of baggage handling system primary sorter replacement project at the Hong Kong International Airport (HKIA). JEC will design, manufacture, supply, deliver, install, and test and commission for the new conveyors, electrical and mechanical works, systems works and structural steel works for baggage diversion at Terminal 1 Baggage Handling Area (including North and South sides), as well as modification works for the existing baggage handling system equipment and firmware. JEC will also provide necessary training to relevant staff and contractors of HKIA on operational and maintenance aspects of these works.